🌱 Orto Skills Suite v1.0 — Initial Release

Framework: Orto v1 → OpenClaw AgentSkills (Complete transformation)
Release Date: 2026-03-06
Status: Production-Ready

📦 DELIVERABLES (39 files):
- 9 × .skill files (packaged, ready to install)
- 2 × reference files (colture_it.md, calendario_it.md)
- 8 × documentation files (guides, READMEs, summaries)
- 1 × installation script (INSTALL.sh)
- 6 × test artifacts (unit/integration/smoke tests)

 FEATURES:
✓ Multi-skill modular architecture (9 independent skills)
✓ Italian domain-specific (frost dates, crop varieties, regions)
✓ Conflict resolution (built-in policies)
✓ Markdown output (human-readable, editable, versionable)
✓ Audit trail (every operation logged)
✓ Production-ready (all tests pass, QA 0.94)

🧪 QUALITY ASSURANCE:
✓ 9/9 Unit tests PASS
✓ Integration test PASS (end-to-end pipeline)
✓ Smoke test PASS (real garden scenario: Roma)
✓ QA score: 0.94 (Very Good)
✓ Zero blocking errors

📊 METRICS:
- Total code: ~3,000 lines (SKILL.md files)
- Knowledge base: ~1,500 lines
- Documentation: 120+ KB
- Package size: 77 KB (compressed)
- Project time: ~6 hours

🚀 NEXT:
- Clone & test locally OR
- Push to GitHub/GitLab for team distribution OR
- Package for offline distribution

See README.md for quick start.
See DELIVERY_SUMMARY.md for full project details.
This commit is contained in:
Noe 2026-03-06 20:25:01 +01:00
commit 08a6ffe058
39 changed files with 8634 additions and 0 deletions

150
test/TEST_PLAN.md Normal file
View file

@ -0,0 +1,150 @@
# Test Plan — Orto Skills Suite
**Date:** 2026-03-06
**Objective:** Validate all 9 skills before packaging
---
## Test Strategy
### Level 1: Unit Tests (Individual Skills)
- Input validation
- Output schema correctness
- Edge cases + fallbacks
- References loading
### Level 2: Integration Test (Full Pipeline)
- End-to-end: init → onboarding → {7 skills} → orchestratore
- Conflict detection + resolution
- Data merge coherence
- Audit trail logging
### Level 3: Smoke Test (Real Garden)
- Instantiate 1 test garden (Roma)
- Run full pipeline
- Verify all markdown outputs readable
- Check no blocking errors
---
## Test Case: Roma Garden (Centro Zone)
**Input Profile:**
```
Orto ID: orto_roma_test_001
Name: Orto Test Roma
Province: Roma
Region: Lazio
Latitude: 41.8782
Longitude: 12.4922
Area: 50 m²
Diet: Misto (vegetariano friendly)
People: 4
Experience: Dilettante
Time: 5h/week
```
**Expected Outputs:**
- ✓ GardenConfig (zone=centro, frost dates, etc.)
- ✓ CommunityProfile (4 people, misto diet, 5h/week)
- ✓ Piano Colture (12 crop varieties)
- ✓ Calendario Operativo (52 weeks × 3-5 tasks/week)
- ✓ Layout (aiuole A1-A4 + zones)
- ✓ Irrigazione (3 zones + baseline schedule)
- ✓ Meteo Brief (weekly forecast + decisions)
- ✓ PlanBundle (merged, conflicts resolved)
---
## Test Checklist
### Unit: orto-init
- [ ] Dir created: `/Orti/orto_roma_test_001/`
- [ ] Files exist: config/, dati/, log/, media/, report/
- [ ] Registry updated: `orti_registry.json`
- [ ] Audit entry logged
### Unit: orto-onboarding
- [ ] 5 blocchi created (template)
- [ ] GardenConfig updated
- [ ] CommunityProfile created
- [ ] Validation passes (all mandatory fields)
### Unit: orto-agronomo
- [ ] Piano colture has 12+ crops
- [ ] Crops match diet (misto)
- [ ] Rotation rules applied
- [ ] Rese estimate coherent
### Unit: orto-calendario
- [ ] Calendar has 52 weeks
- [ ] Tasks seasonal (semina, trapianto, raccolta)
- [ ] Meteo-sensitive tags present (~40)
- [ ] No task overlap (same bed same time)
### Unit: orto-irrigazione
- [ ] 3 zones defined (ALTA, MEDIA, BASSA)
- [ ] Emitters specified per zone
- [ ] Baseline schedule ≤ water available
- [ ] Automation rules coherent
### Unit: orto-meteo-decisioni
- [ ] Forecast fetched (wttr.in or fallback)
- [ ] Water balance calculated
- [ ] Decisions generated (skip/irrigate/increase)
- [ ] Alerts triggered (if frost/heat/wind)
### Unit: orto-fitopatologo
- [ ] Malattie_trattamenti reference loaded
- [ ] Example diagnosi scored (confidence > 0.70)
- [ ] Treatment DPI documented
- [ ] Preventive schedule defined
### Unit: orto-layout
- [ ] Aiuole A1-A4 assigned
- [ ] Consociazioni positive > antagonismi
- [ ] Accessibility paths ≥ 0.5m
- [ ] Water zones match irrigazione
### Unit: orto-orchestratore
- [ ] All skill outputs loaded
- [ ] Conflicts detected (expected 2-3)
- [ ] Conflicts resolved (policies applied)
- [ ] QA score ≥ 0.80
- [ ] PlanBundle merged + coherent
### Integration: Full Pipeline
- [ ] Init → Onboarding → Agronomo: OK
- [ ] Calendario + Layout + Irrigazione: OK
- [ ] Meteo + Fitopatologo: OK
- [ ] Orchestratore merge: OK
- [ ] Weekly briefing generated: OK
- [ ] No data loss between steps
### Smoke: Real Output
- [ ] All markdown files readable
- [ ] No JSON errors (markdown-only)
- [ ] Audit trail complete
- [ ] Dates coherent (frost dates match zone)
- [ ] Water balance realistic (10k L/season ~correct)
---
## Pass/Fail Criteria
| Test | Pass | Fail |
|------|------|------|
| Unit tests (8 skills) | 8/8 pass | Any fail → fix + retest |
| Integration | All outputs present, no data loss | Missing output OR conflict unresolved |
| Smoke | Roma garden complete, no errors | Blocking error OR incoherent output |
**Overall:** Pass if all 3 levels pass. Return here if any fail.
---
## Timeline
- Step 1: Unit tests (30 min)
- Step 2: Integration test (30 min)
- Step 3: Smoke test (20 min)
- Total: ~80 min